Home > News > Content

Installation Steps For Fiber Folding Module

May 16, 2024

1) Mark the steel plate of the furnace steel structure, determine the position of the welding fixing bolts, and then weld the fixing bolts.
2) Lay two layers of fiber blankets on the steel plate in a staggered manner and fix them with cards. The total thickness of the two layers of fiber blankets is 50mm.
3) Align the center hole of the fiber module with the fixing bolt using a guide rod, and lift the fiber module so that the center hole of the module is embedded in the fixing bolt.
4) Use a special wrench to tighten the nut through the center hole sleeve onto the fixing bolt and tighten to secure the fiber module. Install the fiber modules in order.
5) After installation, remove the plastic packaging film, cut the binding tape, extract the guide tube and the protective piece of the plywood, and shape it.
6) If high-temperature coating needs to be sprayed on the surface of fibers, a layer of curing agent should be sprayed first, and then high-temperature coating should be sprayed.

 

 

 

 

 

 

Contact me:Email:wp@cnjingganrefractory.com/sdwenping@163.com

TEL: 86-0533-4188518 / FAX: 86-0533-4188518

Rose:+86-13275332819(wechat/whatsapp number)

Send Inquiry